Before
After
The Kristen Distributing refresh in October 2023 was a four-day endeavor, focused on the warehouse office space. The preparation phase involved masking, scuff sanding, and cleaning of the trim and cabinetry. The team used SW Pro Industrial DTM for the trim and cabinets, colored in Grizzle Gray 7068, and SW Promar 200 for the walls in Gray Matters 7066. Work was mainly conducted over the weekend to minimize disruption, with final touches applied early the following week. This timing coincided with the office's floor and baseboard replacement, streamlining the project's preparation needs.